[300 Men] Accommodation Work Barge With Heavy Lift Deck Crane
Principle Dimensions
| LOA : | 100.00m |
| Beam MLD. : | 31.70m |
| Depth MLD. : | 7.30m |
| Draft (design) : | 5.00m |
| Main Deck Loading : | 12.5 mt/m2 |
| Fuel Type : | Marine Diesel Oil |
Tank Capacity (Approximation)
| Potable F.W. (4 tanks) : | 3000m3 |
| F.O. : | 1242m3 |
| Dirty Oil Tank : | 50m3 |
| Water Ballast : | 10000m3 |
| Bilge Holding Tank : | 65m³ |
| Sewage Tank : | 120m³ |
Mooring System
The barge is equipped with 8 points mooring system c/w remote control in the winch control room monitored by CCTV. Remote system comprises of heave/payout joystick, high/low speed selector switch, brake on/off switch, emergency release switch, air supply on/off switch, drag brake control, electric motor on/off switch and emergency stop button. Tension read out to be provided for each mooring winch.
| Anchors : | 8.00 mt Delta Flipper anchor x 8 plus 1 spare |
| Mooring Winches x 8 : | Hydraulic operated single drum, single drum, auto spooling with drum capacity of 1500 m of steel wire of 52mm diameter |
| Pull @ 1ST Layer : | 85 mt x 12 meter/min |
| Brake Holding : | 150 mt with fail safe brake, hydraulic release and manual override |
| Power Packs : | 4 in nos. Each power pack to drive 2 set of winches |
| Wire Ropes : | 8 x 1500m x 52mm diameter galvanized steel wire |
| Tugger Winch : | 1 x 10 mt @ 15meter/min |
Power Plant
| Main Generator : | 5 x 500 kW, 415/3/50, 3-Wire System, Diesel Engine driven |
| Emergency Generator : | 1 x 245 kW, 415/3/50, Air Cooled Diesel Engine driven |
Others
| Platform Power Supply : | 100 kW |
| Shore Connection Power Supply : | 600 kW |
Other Machinery & Pumps
| Bilge and Ballast Pump : | 2 x electric driven centrifugal self priming pump, 500m3/hr @ 30m head |
| Fire and G.S. Pump : | 2 x electric driven centrifugal self priming pump, 130m3/hr @ 120m head |
| Fuel Oil Transfer Pump : | 2 x electric driven gear pump, 45m3/hr @ 45m head |
| FW Transfer Pump : | 2 x electric driven centrifugal self priming pump, 120m3/hr @35m head |
| Fresh Water Maker : | 2 x 50 mt/day reverse osmosis type |
| Sewage Treatment Plant : | 2 x 150 men per day compliance to IMO |
| Service Air Compressor : | 2 x electric motor driven high pressure air compressor 175 cfm @ 10 bar c/w with 2 x 2m3 air receivers |
Sea Chest
All the sea chests are installed with Marine Growth Prevention System (MGPS)
Fire Fighting Equipment
- Fixed CO2 system for Auxiliary Machinery Room
- Fixed automatic water sprinkler system for living quarters
- Fire detection system for accommodation spaces and machinery room spaces as per Class & SOLAS requirement. Central fire alarm monitoring system is located in the control room.
- The helideck is to be equipped with 4 sets of monitors and 2 sets with foam and water application. The fire pump capacity for the helideck is to be of 227 m3/hr at 89 metres head with suction from an independent sea chest
Communication/Navigation System
Echo Sounder, Radar x 1, GPS x 2, SART, EPIRB, Gyro Compass, Magnetic Compass, AIS, SSAS, Radio Communication Equipment, Helicopter Communication Equipment, Intercom & PA system
Accommodation
Accommodation spaces are fully air-conditioned except for service spaces, will be spot cooled. Each deck is equiped with 1 air-cond plant with 100% back up. The cabin layout is to be as follows:
| 1 berth cabin x 10 : | 10 men |
| 2 berth cabin x 9 : | 18 men |
| 4 berth cabin x 68 : | 272 men |
| Total : | 300 men |
Others
Offices, galley, mess room, recreation room, freezer and chiller room, stores, sick bay, laundry, paint store, work shop and etc.
Deck Crane
Owner-supplied item. The deck crane to be installed will be Amclyde 35000
Heli-Deck
Designed for suitable loading of up to 15 mt/m2
Painting
Anti-fouling system for 5 years