60m Anchor Handling/ Offshore Support Vessel
Principle Dimensions
| LOA : | 60.00m |
| LBP (W.L) : | 58.74m |
| Beam (MLD.) : | 16.00m |
| Depth (MLD.) : | 06.00m |
| Draft (MLD.) Max. : | 05.10m |
| Deck Area : | 390m2 approximate |
| Deck Loading : | 5 mt/m2 |
| Speed : | Min. 13 knots @ 100% MCR |
| Bolland Pull : | 60 mt @ 100% MCR |
| Endurance : | Min. 22 Days |
| Complement : | 40 men |
| Fuel Type : | Marine Diesel Oil |
| Fuel Oil Consumption @ 75% MCR : | 14.12 mt / day @ 12 knots at 4 M mean draft (main engines only) |
| Fuel Oil Consumption @ 100 % MCR : | 18.5 mt / day @ 13 knots at 4 M mean draft (main engines only) |
Tank Capacity (Approximation)
| F.W. : | 480m3 |
| F.O. : | 530m3 |
| Liquid Mud/Brine/DW : | 190m3 |
| Base Oil/Brine/DW Tank : | 180m3 |
| Foam Tank : | 10m3 |
| Dispersant Tank : | 10m3 |
| Sewage Holding Tank : | 12m3 |
| Bilge Holding Tank : | 10m3 |
Main Machinery/ Propulsion System
Main Engine
2 X 2610 (1920 kw) @ 750 RPM c/w PTO aft c/w CPP & shaft generator and PTO fwd for FiFi pumps c/w gear box
Propulsion System
2 x CPP reduction gear box, & gear box with P.T.O. for the shaft generator of 1000 kW, 415/3/60, 3 wires.
Bow Thruster
1 x Bow CPP Tunnel Thrusters, having thrust of 8 mt, electric motor driven by shaft generator
Stern Thruster
1 X Stern CPP Tunnel Thrusters, having thrust of 6 mt, electric motor driven by shaft alternator
Steering Gear
2 x Independent Electro-Hydraulic steering gear system
Rudder
2 x High Lift Rudder c/w Flap
Power Plant
| Main Generator : | 2 x 275 kW, 415/3/50, 3 Wire System, Diesel Engine Driven |
| Shaft Alternators : | 2 x 1000 kW, 415/3/50 |
| Emergency Generator : | 1 x 84 kW, 415/3/50 |
Deck Machinery
| Anchor Handling Cum Towing Winch : | Electro-Hydraulic Driven Twin Drums in Waterfall Configuration Speed Range - 4 Brake Holdings - 250 mt (1st layer)/spring loaded hyd. release Dynamic lowering @ 25 mt @ 0 to 36m/min (1st layer) Remote control in Wheelhouse and local control at site |
| Towing Pins : | 2 x suitable for 60 mt BP Equip with rotating liners c/w turnable flapses & hydraulic cylinders for lifting and lowering |
| Shark Jaws : | 1 set Hydraulic operated retractable lock jaw of 300 mt SWL. Stopper is suitable for wire and chain of size from 1 ¾” to 3 ½” Ø |
| Stern Roller : | 1.6 – 1.8m dia. X 4.2m length with SWL of 375 mt |
| Others : | Capstan (2), Tugger Winch (2) & Storage Rope Reel (1) Hydraulic operated with local controls only |
Fire Fighting Equipment
| External Fire Fighting System : | ABS FiFi Class 1 c/w 2 x Fire Monitors (Water/Foam) and with Fixed Water Spraying System |
| Fixed Fire Protection System : | Fixed CO2 System for Engine Room & Bow Thruster Room & Local Water mist as per Class rules. |
| Fire Alarm & Detection System : | As per ABS rules |
Communication/Navigational Equipment
| Communication System : | GMDSS A1 to A3, PA/Talk back and Sound Powered Telephone system |
| Navigational Aids | Echo Sounder, Radars x 2, GPS Navigator (IMO), SART(2), 406MHz EPIRB, Gyro Compass, Auto Pilot, AIS, SSAS, Speed Log, Navtex Receiver, Magnetic Compass, Anemometer |
Accommodation
All accommodation spaces and engine control room are full air-conditioned
| Accommodation Layout | 1-berth cabin x 4 : 4 men 2-berth cabin x 2 : 4 men 4-berth cabin x 8 : 32 men Total : 40 men Sickbay : 1 man |
Spare Parts
Class Standard requirements applied.